# Load Calendars

https://docs.vamsys.co.uk/routes/load-calendars/

> Change how full flights are through the year with seasons and events such as holidays, and assign a calendar to airports and tags.

Last updated: 2026-11-27

**Where to find it:** Orwell › Network › Payload

A load calendar changes which [load factor](https://docs.vamsys.co.uk/routes/load-factors.md) a flight gets through the year. **Seasons** set the usual pattern, and **events** cover dates such as holidays. Calendars are optional: until you make one, flights load from the load factors set on their routes, airports and tags, and from your defaults. You need the **Manage load factors** staff permission.

> **Note:** During the v5.5 beta, v5 shows load factors read-only and v5.5 owns them, so a change here is not made in v5. See [How the vAMSYS v5.5 beta works](https://docs.vamsys.co.uk/getting-started/5-5-beta.md).

## The Load Calendars list {#list}

The list is grouped by kind, with the views **All**, **Passengers** and **Cargo**. Columns are the name, the year as a ribbon of seasons and events, **Seasons and Events** and **Used By**. **Try a Flight** works here as on [Load Factors](https://docs.vamsys.co.uk/routes/load-factors.md#try). A notice appears when an event entered year by year has no dates for next year, because without them it lifts no flights.

## Create or edit a calendar {#form}

1. Select **New Calendar**.
2. Give it a **Name** and a kind, **Passengers** or **Cargo**. A calendar keeps its kind and offers only load factors of that kind, so make those first.
3. Shape the year, adding seasons and events as described below.
4. Select **Create**.

**Follow the Hemisphere**: at airports south of the equator the seasons run six months later, so a summer season falls in the southern summer. Events keep their dates.

**Preview at…** shows the year as one of your airports reads it.

### Seasons {#seasons}

The year runs along a chart from quieter to busier. Drag a boundary along the months, or focus it and use the arrow keys (Shift moves a week). Click a stretch to choose its **season**, and click under the months to add a boundary. Delete removes a focused boundary, and the stretch after it joins the one before. Each season has a name and one load factor, and can have several stretches.

### Events {#events}

**Add an event** for dates that lift or lower loads. An event has:

- A name.
- **When**, in one of four ways: **Every year** (such as 19 Dec to 23 Dec), **Listed per year** (dates you enter for each year, such as a movable festival), **Around Easter** (days before or after Easter Sunday), or **Islamic calendar** (dates follow the Umm al-Qura calendar used in Saudi Arabia. The Hajj itself is 8 to 13 Dhu al-Hijjah).
- **Flights It Touches**: **Leaving here**, **Arriving here** or **Both ways**.
- A **Load Factor**.

When events overlap, the route's own first, then the busiest event decides. See [which load factor a flight gets](https://docs.vamsys.co.uk/routes/load-factors.md#resolution).

## Assign a calendar {#assign}

Choose a calendar where it applies the same way as a load factor: on a route, an airport's **Load Management** tab, a tag, or as your default in Payload Settings. **Assign to…** on the calendar's page does it for many at once. Choose **Airports** or **Tags**, tick them, choose **Applies To** (both ways, leaving or arriving) and optionally **For** one operator. It replaces what those airports or tags set for that kind, and runs in the background.

## Duplicate and delete {#delete}

**Duplicate** and **Delete** are in the **More** menu on the calendar's page, and in the menu on its row. A calendar that is a default can't be deleted until you pick another default in Settings. Otherwise the window lists the tags, airports and routes that use it, and what those airports load from instead.

## Page history

- 2026-11-27 (v5.5.0): First version for v5.5.
